Cleanliness is a human need to be healthy. In Tanggamus Regency the cleanliness still very lacking, but the government continues to strive so he cleanliness can be promoted by each district in Tanggamus. The problem in assessing cleanliness between sub districts in Tanggamus is very difficult. Because there are many sub-districts in the Tanggamus area, so there needs to be a system that can assist in the assessment. This Decision Support Sys- tem was made to assist the hygiene assessment process using the TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) method by the Sanitation and Gardening Department (DKP). The existence of this system can help district employees in the assessment of cleanliness between sub district in Tanggamus regency.

Biografía del autor/a

Phong Thanh Nguyen
Department of Project Management, Ho Chi Minh City Open University, Vietnam.
Herman Herman
Department of Information Systems, STMIK Pringsewu, Lampung, Indonesia.
Quyen Le Hoang Thuy To Nguyen
Office of Cooperation and Research Management, Ho Chi Minh City Open University, Vietnam.
I Wayan Suparta
Economic Department, Economic and Business Faculty, Lampung University, Indonesia.
Vy Dang Bich Huynh
Department of Learning Material, Ho Chi Minh City Open University, Vietnam.

Citas

. Ambika, P., Ayshwarya, B., Nguyen, P. T., Hashim, W., Rinjani, F., Muslihudin, M., . . . Maseleno, A. (2019). The best of village head performance: Simple additive weighting method. International Journal of Recent Technology and Engineering, 8(2 Special Issue 3), 1568-1572. doi:10.35940/ijrte.B1286.0782S319

. Andriyani, N., Likhitruangsilp, V., & Chovichien, V. (2006). A framework of knowledge acquisition systems for governmental agencies in public construction projects. Paper presented at the Real Structures: Bridges and Tall Buildings - Proceedings of the 10th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2010. [3]. Ayshwarya, B., Firdiansah, F. A., Alfian, F. Y., Nguyen, P. T., Hashim, W., Shankar, K., . . . Maseleno, A. (2019). The best land selection using simple additive weighting. International Journal of Recent Technol- ogy and Engineering, 8(2 Special Issue 3), 1520-1525. doi:10.35940/ijrte. B1278.0782S319

. Bahrami, N., Liu, S., Ponkratov, V. V., Nguyen, P. T., Maseleno, A., & Berti, S. (2019). Novel load management for renewable generation sources/battery system through cut energy expenditure and generate reve- nue. International Journal of Ambient Energy. doi:10.1080/01430750.201 9.1636868

. Fitriana, A., Nguyen, P. T., Rema Devi, S., Shankar, K., Abadi, S., Hashim, W., & Maseleno, A. (2019). Decision support system of employ- ee performance evaluation. International Journal of Engineering and Ad- vanced Technology, 8(6 Special Issue 2), 1007-1012. doi:10.35940/ijeat. F1307.0886S219

. Handayani, T. N., Likhitruangsilp, V., & Yabuki, N. (2019). A building information modeling (BIM)-integrated system for evaluating the impact of change orders. Engineering Journal, 23(4), 67-90. doi:10.4186/ ej.2019.23.4.67

. Huda, M., Hashim, A., Teh, K. S. M., Shankar, K., Ayshwarya, B., Nguyen, P. T., . . . Maseleno, A. (2019). Learning quality innovation through integration of pedagogical skill and adaptive technology. Interna- tional Journal of Innovative Technology and Exploring Engineering, 8(9Special Issue 3), 1538-1541. doi:10.35940/ijitee.I3321.0789S319

. Huynh, V. D. B., Van Nguyen, P., Nguyen, Q. H. T. T., & Nguyen, P. T. (2018). Application of Fuzzy Analytical Hierarchy Process based on Geometric Mean Method to prioritize social capital network indicators. International Journal of Advanced Computer Science and Applications, 9(12), 182-186. doi:10.14569/IJACSA.2018.091227

. Ioannou, P. G., & Likhitruangsilp, V. (2005). Simulation of multi- ple-drift tunnel construction with limited resources. Paper presented at the Proceedings - Winter Simulation Conference.

. Kokkaew, N., & Likhitruangsilp, V. (2018). Comparing Life Cy- cle Cost of Public and PPP Transportation Infrastructure in Thailand: An Empirical Evidence. Paper presented at the ICCREM 2018: Construction Enterprises and Project Management - Proceedings of the International Conference on Construction and Real Estate Management 2018.

. Kumar, R., Ayshwarya, B., Muslihudin, M., Nguyen, P. T., Alfian, F. Y., Hashim, W., . . . Maseleno, A. (2019). Into the furniture woods: Ana- lytical hierarchy process method. International Journal of Recent Technol- ogy and Engineering, 8(2 Special Issue 3), 1562-1567. doi:10.35940/ijrte. B1285.0782S319

. Likhitruangsilp, V., Handayani, T. N., Ioannou, P. G., & Yabuki, N. (2018). A BIM-enabled system for evaluating impacts of construction change orders. Paper presented at the Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018.

. Likhitruangsilp, V., & Harinthajinda, P. (2008). Assessment of contractors’ risk response in tunneling projects. Paper presented at the EA- SEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineer- ing and Construction.

. Likhitruangsilp, V., & Ioannou, P. G. (2004). Risk-sensitive deci- sion support system for tunnel construction. Paper presented at the Geo- technical Special Publication.

. Likhitruangsilp, V., & Ioannou, P. G. (2005). Economic assess- ment of site exploration programs using stochastic dynamic programming. Paper presented at the Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress.

. Likhitruangsilp, V., & Ioannou, P. G. (2009). Risk allocation in standard forms of general conditions for tunneling contracts. Paper pre- sented at the Building a Sustainable Future - Proceedings of the 2009 Con- struction Research Congress.

. Likhitruangsilp, V., & Ioannou, P. G. (2012). Analysis of risk-re- sponse measures for tunneling projects. Paper presented at the Construc- tion Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress.

. Likhitruangsilp, V., Ioannou, P. G., & Leeladejkul, S. (2014). Mapping work process and information exchange of construction entities for BIM implementation: Case study of an academic institute. Paper pre- sented at the Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference on Computing in Civil and Building Engineering.

. Likhitruangsilp, V., Le, H. T. T., Yabuki, N., & Ioannou, P. G. (2019). Integrating building information modeling and visual program- ming for building life-cycle cost analysis. Paper presented at the ISEC 2019 - 10th International Structural Engineering and Construction Confer- ence.

. Likhitruangsilp, V., & Praphansiri, K. (2010). Identifying risk fac- tors in equipment procurement of power plant projects. Paper presented at the COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors.

. Likhitruangsilp, V., & Prasitsom, A. (2008). Construction joint venture contracting. Paper presented at the COBRA 2008 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors.

. Likhitruangsilp, V., Putthividhya, W., & Ioannou, P. G. (2012). Conceptual framework of the Green Building Information Management System. Paper presented at the Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Con- struction Research Congress.

. Likhitruangsilp, V., & Sarutirattanaworakun, R. (2006). Dynamic resource allocation for tunnel construction by discrete-event simulation. Paper presented at the Construction and Professional Practices - Proceed- ings of the 10th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2010.

. Long, L. D., Tran, D. H., & Nguyen, P. T. (2019). Hybrid mul- tiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem. International Journal of Computer Appli- cations in Technology, 60(3), 203-214. doi:10.1504/IJCAT.2019.100299 [25]. Luong, D. L., Tran, D. H., & Nguyen, P. T. (2018). Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management. doi:10.1080/15623599.2018.1526630

. Mukhlis, H., Ayshwarya, B., Nguyen, P. T., Hashim, W., Hardono, Maesaroh, S., . . . Maseleno, A. (2019). Boarding house selection using SAW method. International Journal of Recent Technology and Engineer- ing, 8(2 Special Issue 3), 1500-1505. doi:10.35940/ijrte.B1275.0782S319 [27]. Muslihudin, M., Ayshwarya, B., Effendi, Yusfika, D., Pribadi, M. R., Susanto, F., . . . Vellyana, D. (2019). Application of weighted product method for determining home renovation assistance in Pringsewu district. International Journal of Recent Technology and Engineering, 8(2 Special issue 2), 385-391. doi:10.35940/ijrte.B1063.0782S219

. Muslihudin, M., Trisnawati, Mukodimah, S., Hashim, W., Aysh- warya, B., Nguyen, P. T., . . . Maseleno, A. (2019). Performance of saw and wp method in determining the feasibility of motorcycle engineering workshop for competency test of vocational high school student. Interna- tional Journal of Recent Technology and Engineering, 8(2 Special Issue 2), 348-353.

. Nguyen, P. T., Huynh, V. D. B., & Nguyen, Q. L. H. T. T. (2019). Using fuzzy analytical network process approach to develop job search success model of engineering graduates. International Journal of Recent Technology and Engineering, 8(1), 366-369.

. Nguyen, P. T., & Likhitruangsilp, V. (2017). Identification risk fac- tors affecting concession period length for public-private partnership in- frastructure projects. International Journal of Civil Engineering and Tech- nology, 8(6), 342-348.

. Nguyen, P. T., Likhitruangsilp, V., & Onishi, M. (2018). Prior- itizing factors affecting traffic volume of public-private partnership infra- structure projects. International Journal of Engineering and Technology- (UAE), 7(4), 2988-2991. doi:10.14419/ijet.v7i4.13357

. Nguyen, P. T., Van Nguyen, P., To Nguyen, Q. L. H. T., & Huynh, V. D. B. (2016). Project success evaluation using TOPSIS algorithm. Jour- nal of Engineering and Applied Sciences, 11(8), 1876-1879. doi:10.3923/ jeasci.2016.1876.1879

. Nguyen, P. T., Vo, K. D., Phan, P. T., Huynh, V. D. B., Nguyen, T. A., Cao, T. M., . . . Le, L. P. (2018). Construction project quality man- agement using building information modeling 360 field. International Journal of Advanced Computer Science and Applications, 9(10), 228-233. doi:10.14569/IJACSA.2018.091028

. Nguyen, P. T., Vu, N. B., Van Nguyen, L., Le, L. P., & Vo, K. D.(2019). The Application of Fuzzy Analytic Hierarchy Process (F-AHP) in Engineering Project Management. Paper presented at the 2018 IEEE 5th International Conference on Engineering Technologies and Applied Sciences, ICETAS 2018.

. Nguyen, P. V., Nguyen, P. T., Nguyen, Q. L. H. T. T., & Huynh, V. D. B. (2019). Extended fuzzy analytical hierarchy process approach in de- terminants of employees’ competencies in the fourth industrial revolution. International Journal of Advanced Computer Science and Applications, 10(4), 150-154.

. Nguyen, T. A., Nguyen, P. T., & Peansupap, V. (2015). Explaining model for supervisor’s behavior on safety action based on their percep- tions. ARPN Journal of Engineering and Applied Sciences, 10(20), 9562- 9572.

. Pham, C. P., Nguyen, P. T., Vo, K. D., Phan, P. T., Huynh, V. D. B., & Nguyen, Q. L. H. T. T. (2019). Fuzzy logic with engineering application of housing construction licensing service quality. International Journal of Recent Technology and Engineering, 8(1), 361-365.

. Phong, N. T., Likhitruangsilp, V., & Onishi, M. (2017). Develop- ing a stochastic traffic volume prediction model for public-private partner- ship projects. Paper presented at the AIP Conference Proceedings.

. Phong, N. T., & Quyen, N. L. H. T. T. (2017). Application fuzzy multi-attribute decision analysis method to prioritize project success crite- ria. Paper presented at the AIP Conference Proceedings.

. Phong, T. N., Phuc, V. N., & Quyen, T. T. H. L. N. (2017) Appli- cation of fuzzy analytic network process and TOPSIS method for material supplier selection. In: Vol. 728. Key Engineering Materials (pp. 411-415). [41]. Prasitsom, A., & Likhitruangsilp, V. (2012). Design of administra- tive structures for construction joint ventures. Paper presented at the Joint Ventures in Construction 2: Contract, Governance, Performance and Risk. [42]. Rusliyadi, M., Kumalasari, R. T., Nguyen, P. T., Hashim, W., & Maseleno, A. (2019). Potential jatropha curcas (Jatropha curcas L.) germplasm by exploration in gorontalo province Indonesia. Internation- al Journal of Recent Technology and Engineering, 8(2 Special Issue 3), 1617-1624. doi:10.35940/ijrte.B1295.0782S319

. Suyatno, Nguyen, P. T., Dinesh Kumar, A., Pandi Selvam, R., & Shankar, K. (2019). Examination of information system design for stu- dent’s scoring processing. International Journal of Engineering and Ad- vanced Technology, 8(6 Special Issue 2), 1143-1147. doi:10.35940/ijeat. F1312.0886S219

. Sy, D. T., Likhitruangsilp, V., Onishi, M., & Nguyen, P. (2017). Different perceptions of concern factors for strategic investment of the pri- vate sector in public-private partnership transportation projects. ASEAN Engineering Journal, 7(2), 66-86.

. Sy, D. T., Likhitruangsilp, V., Onishi, M., & Nguyen, P. T. (2017). Impacts of risk factors on the performance of public-private partnership transportation projects in Vietnam. ASEAN Engineering Journal, 7(2), 30- 52.

. Van Nguyen, P., Nguyen, P. T., Huynh, V. D. B., & Nguyen, Q. L. H. T. T. (2017). Critical factors affecting the happiness: A Vietnamese perspective. International Journal of Economic Research, 14(4), 145-152. [47]. Van Nguyen, P., Nguyen, P. T., Nguyen, Q. L. H. T. T., & Huynh, V. D. B. (2016). Calculating weights of social capital index using analytic hierarchy process. International Journal of Economics and Financial Is- sues, 6(3), 1189-1193.

. Vo, K. D., Nguyen, P. T., Pham, C. P., Huynh, V. D. B., Nguyen, Q. L. H. T. T., Vu, N. B., & Le, L. P. (2019). Measuring individual job performance of project managers using fuzzy extended analytic method. International Journal of Recent Technology and Engineering, 8(2 Special Issue), 86-90. doi:10.35940/ijrte.a1379.078219

. Wahyudi, A., Zulela, Marini, A., Choirudin, Ayshwarya, B., Nguyen, P. T., & Shankar, K. (2019). Government policy in realizing basic education metro. International Journal of Innovative Technology and Ex- ploring Engineering, 8(9 Special Issue 3), 113-116.

. Yunita, D., Ayshwarya, B., Ridhawati, E., Huda, M., Hashim, A., Teh, K. S. M., . . . Maseleno, A. (2019). Application of analytical hierarchy process method in laptop selection. International Journal of Recent Tech- nology and Engineering, 8(2 Special Issue 3), 1603-1607. doi:10.35940/ ijrte.B1291.0782S319

Publicado
2019-06-09
Cómo citar
Thanh Nguyen, P., Herman, H., Thuy To Nguyen, Q. L. H., Wayan Suparta, I., & Bich Huynh, V. D. (2019). Cleanliness Assessment of Sub-District in Regency Using Technique for Order Preference by Similarity to Ideal Solution. Opción, 35, 2899-2921. Recuperado a partir de https://produccioncientificaluz.org/index.php/opcion/article/view/30142

Artículos más leídos del mismo autor/a

1 2 3 > >>