[1]
D. De León, S. Díaz Camacho, y C. A. González Pérez, «Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration.», REV TEC FAC ING UNIV, vol. 36, n.º 2, 1.