De León, D., Díaz Camacho, S. and González Pérez, C. A. (1) “Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration.”, Rev. Téc. Fac. Ing. Univ. Zulia, 36(2). Available at: https://produccioncientificaluz.org/index.php/tecnica/article/view/6900 (Accessed: 23December2025).