[1]
De León, D., Díaz Camacho, S. y González Pérez, C.A. 1. Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration. Revista Técnica de la Facultad de Ingeniería. Universidad del Zulia. 36, 2 (1).